Operation Steps
Operation Procedure: Checking (Accessory and Machine Testing) Matching Balls and Loading Material Pot Loading Switching On Setting Parameters Grinding Machine Stopping Unloading Pot and Discharging Powder Machine Cleaning.
1.4.1 Check
1.4.1.1 Accessory and Outlook Check
First, check the packing list carefully after opening the plywood case, and make sure if there is any missing on the attachment, whether there is any break or damage to the shell off the machine during transportation. If any, please do not hesitate to inform us immediately. If everything is normal, switch on power and let the machine work without any load (mill jars and mill balls).
1.4.1.2 Running Without Load
Figure 3 Diagram of Control Panel of Planetary Ball Mill
3-1 Frequency Speed Controller 3-2 Emergency Switch
3-3 Start Button 3-4 Stop Button
Steps of Testing Machine Without Load